Multiple Subcontracting in Overseas Tank Farm Projects Poses Major Hidden Risks: How Can Integrated Engineering Help EPCs Avoid Interface Risks?
2026-09-28 10:13:28

During the construction of overseas petrochemical tank farm and industrial terminal projects, many EPC general contractors habitually split storage tanks, industrial steel structures, and process piping among different suppliers for separate execution. This may appear to allow price comparison and cost reduction, but as the project advances, it easily exposes various thorny problems: unclear responsibility bounDaries, conflicting lifting sequences, inconsistent delivery documentation standards among suppliers, and disputes over cross-operation on site, ultimately resulting in rework, schedule delays, and additional project costs.

 Overseas EPC Subcontracting


This is a very common pain point in overseas industrial projects. The three systems—storage tanks, steel structures, and piping—are often located on the same construction site and share lifting equipment and welding resources, with numerous interface points. If they are handled by different subcontractors, the interfaces become high-risk areas. Once quality or schedule issues arise, multiple parties may pass the buck to one another, and the owner and EPC must invest substantial manpower in coordination and communication.


To address this industry pain point, XINO GROUP Steel adopts an integrated delivery model for storage tanks, steel structures, and process piping. A single contractor is solely responsible for the manufacturing, export, and on-site execution of all three segments, internalizing all interface risks within the company and reducing the customer's cross-supplier coordination pressure.


We have 15 years of steel structure manufacturing experience and 13 years of overseas project execution experience. Our factory has a 500,000 m² processing workshop and an annual capacity of 500,000 metric tons. We hold ISO 9001, ISO 14001, ISO 45001, EN 1090, ISO 3834, and other system certifications, and we complete design and prefabrication in strict accordance with international codes such as API, ASME, EN, AWS, and AISC.


XINO GROUP


With integrated delivery, customers can choose a cooperation model based on their needs: purchasing prefabricated components only; supply plus on-site technical supervision; or full subcontracting services covering manufacturing, international logistics, on-site installation, pressure testing, and commissioning support. All deliverables come with a complete traceable documentation package, including material test reports (MTRs), WPS/PQR welding procedure qualifications, NDT reports, anti-corrosion inspection reports, and as-built drawings, available in English or bilingual versions to meet the review requirements of third-party inspection agencies such as SGS, BV, TÜV, and Intertek.


We adhere to a factory-first modular prefabrication philosophy, completing welding, fit-up, and anti-corrosion work in controlled domestic workshops as much as possible, reducing overseas work at height and mitigating the impact of harsh site environments such as high temperatures and rainy seasons on schedule and safety.



XINO GROUP


For tank farm, refinery, and power plant projects in the Middle East, Southeast Asia, Central Asia, Africa, and Latin America, choosing an integrated contractor can help EPCs and owners focus more energy on overall project management rather than juggling multiple subcontractors.


If you are preparing an overseas storage tank, steel structure, and piping project, you are welcome to provide the project technical parameters to obtain a customized technical solution and quotation.